Srinagar-Leh Transmission System Transferred to PGCIL
The transmission system was dedicated to the nation by the Prime Minister in February 2019, and it connects the Ladakh region to the national grid, ensuring quality and reliable power supply. Built at a height of around 3000-4000 meters, this 335-km long transmission line traverses snowbound difficult hilly terrain. May......