Sterlite Power Submits Bids for Two Battery Storage Projects in US - Wire & Cable India
Wire & Cable India
News

Sterlite Power Submits Bids for Two Battery Storage Projects in US

The company has submitted bids for two grid connected energy storage projects for a cumulative capacity of 400 MW in the recently concluded auction of Salt River Project utility in Arizona.

Sterlite Power Submits Bids for Two Grid Connected Battery Storage Projects in US
The recent bidding marks the first foray of Sterlite Power into grid connected battery energy storage systems (BESS).

February 14, 2019

Sterlite Power has submitted bids for two grid connected battery for a cumulative capacity of 400 MW. The solution provides for utility’s capacity and energy needs, including ancillary services.

Grid connected BESS are rapidly achieving commercially viability for utilities around the world as total system costs have dropped approximately 60 percent over the last 5 years. As grids integrate a greater share of renewables in their footprints, BESS solutions are needed for a seamless and reliable transition. These systems provide critical services like peak load shaving, energy and ancillary services that will be increasingly needed in a renewable-heavy grid.

Given the experience Sterlite Power has in commissioning and operating transmission grids, the company understands that BESS solutions are inevitable for grids across the world.

WordPress Ads