The pilot project is scheduled to come online in December 2021 and will be the world’s first floating solar plant operating in rough offshore waters.
July 29, 2021
Nexans has been awarded by Equinor a contract to supply power export cable for its innovative floating solar pilot offshore Frøya in Norway.
[bsa_pro_ad_space id=13]
The Frøya floating plant will measure 80 m x 80 m, with a height of less than 3 m above the sea surface, hosting an array of solar panels capable of producing up to 1MW.
Watch: Wire & Cable India Fortnightly News Roundup.
Utility-scale floating solar power is currently one of the fastest-growing renewable technologies as governments and investors around the world explore every possibility for safer, sustainable, and decarbonized energy. This is expected to drive almost 10 GW of new floating solar deployment by 2025.
Also Read: Prysmian Secures Inter-Array Submarine Cable Systems Contract.
Nexans will supply a 22 kW export cable of 5 km to connect the floating platform from shallow waters to land. The most challenging aspect for the cable construction is to handle the dynamic loadings as the connection at the platform end pitches up and down with the waves. Nexans is utilizing a three-core cable design of a type well proven in offshore wind farm and fish farming installations. The cable will be manufactured at the Rognan plant in Norway.